FRANCE-ENERGY-DAM-CONTROL

An excavator is at work to prepare a temporary road for maintenance operations on the settlement of the artificial dried out Guerledan's lake on April 23, 2015 in Mur-de-Bretagne, in Brittany, western France, during a complete flush operation in order to verify the integrity of the construction built in 1930. The lake of 400 ha area and a volume of 51 million cubic metres of water, was last drained in 1985. AFP PHOTO / FRED TANNEAU (Photo credit should read FRED TANNEAU/AFP via Getty Images)
An excavator is at work to prepare a temporary road for maintenance operations on the settlement of the artificial dried out Guerledan's lake on April 23, 2015 in Mur-de-Bretagne, in Brittany, western France, during a complete flush operation in order to verify the integrity of the construction built in 1930. The lake of 400 ha area and a volume of 51 million cubic metres of water, was last drained in 1985. AFP PHOTO / FRED TANNEAU (Photo credit should read FRED TANNEAU/AFP via Getty Images)
FRANCE-ENERGY-DAM-CONTROL
ACQUISTA UNA LICENZA
Come posso utilizzare questa immagine?
475,00 €
EUR

DETTAGLI

Restrizioni:
Contatta l'ufficio locale per informazioni su qualsiasi tipo di uso commerciale o promozionale. Diritti editoriali illimitati per Regno Unito, Stati Uniti, Irlanda, Italia, Spagna, Canada (escluso Quebec). Diritti editoriali limitati in altri Paesi. Contatta l'ufficio locale.
Attestazione:
FRED TANNEAU / Stringer
N. Editorial:
470820410
Collezione:
AFP
Data di creazione:
23 aprile 2015
Data di upload:
Tipo di licenza:
Info sulla liberatoria:
Senza liberatoria. Ulteriori informazioni
Fonte:
AFP
Codice a barre:
AFP
Nome oggetto:
Par8156046
Max. dimensione file:
4256 x 2832 px (36,03 x 23,98 cm) - 300 dpi - 4 MB