The Construction Site For The Metro C

ROME, ITALY - DECEMBER 27: The mole digging inside the construction site for the extension of Line C of the Rome Metro, along the section that will connect the future Amba-Aradam station to the one, still to be reached, of Piazza Venezia on December 27, 2019 in Rome, Italy. The route reaches a maximum depth of 57 metres. The two moles are currently at the height of San Pietro in Carcere and are continuing to dig the last 150 meters that separate them from the final finish line di piazza Venezia. The Amba-Aradam metro station will open in 2024. (Photo by Stefano Montesi - Corbis/ Getty Images)
ROME, ITALY - DECEMBER 27: The mole digging inside the construction site for the extension of Line C of the Rome Metro, along the section that will connect the future Amba-Aradam station to the one, still to be reached, of Piazza Venezia on December 27, 2019 in Rome, Italy. The route reaches a maximum depth of 57 metres. The two moles are currently at the height of San Pietro in Carcere and are continuing to dig the last 150 meters that separate them from the final finish line di piazza Venezia. The Amba-Aradam metro station will open in 2024. (Photo by Stefano Montesi - Corbis/ Getty Images)
The Construction Site For The Metro C
ACQUISTA UNA LICENZA
Come posso utilizzare questa immagine?
475,00 €
EUR

DETTAGLI

Restrizioni:
Contatta l'ufficio locale per informazioni su qualsiasi tipo di uso commerciale o promozionale.
Attestazione:
Stefano Montesi - Corbis / Collaboratore
N. Editorial:
1190613525
Collezione:
Corbis News
Data di creazione:
27 dicembre 2019
Data di upload:
Tipo di licenza:
Info sulla liberatoria:
Senza liberatoria. Ulteriori informazioni
Fonte:
Corbis News
Nome oggetto:
cantiere_metroc27.jpg
Max. dimensione file:
7360 x 4912 px (62,31 x 41,59 cm) - 300 dpi - 25 MB